river


Form button


Operator Training Button


Calendar Button


Minutes Button


Agenda Button


Hydrogeologic Button


Links Button


nerain


Weather Forecast

trust

 

Well Permits

Anyyone wishing to construct a new or replacement well pumping over 50 gallons per minute must obtain a permit from the NRD before construction can begin. Permits are not required for test holes or temporary dewatering wells. All wells are required to be registered with the State Department of Natural Resources within 30 days after the well is completed.

On March 17, 2006 the Little Blue NRD issued a stay on drilling wells, or a series of wells, that are designed to pump 50 gallons per minute or more and a stay on expansion of irrigated acres in an area titled Quantity Sub-Area 8. 

On May 12, 2014 a stay was enacted on the drilling of new high-capacity irrigation wells in portions of the district where the aquifer is less than 10 feet thick or is absent (stay map)

Pre-application for a Well Permit
Little Blue NRD Well Permit